On other pages of our website, you’ve learned that a Next Generation Modular Home costs no more than a "stick-built" home but features higher quality products and uses 30% more construction materials resulting in a Higher Value Home.

How can that be? It’s all about TIME.

The construction of a Next Generation Modular Home takes about a third of the time required to build a comparable conventional “stick-built” home. This time saving adds to YOUR bottom line!

We’ve outlined the steps translated into time for the construction of your Next Generation Modular Home. Review them in detail below and feel free to print our handy timeline sheet, that will show you a side-by-side comparison as well.

Example of a 3,000 sq. ft house (barring any potential weather issues)
Modular Construction
Timeframe

Grading and site preparation
Foundation
Curing of foundation

Week 1 to 3

Framing
Installation of windows and Exterior doors
Roofing
Rough electrical
Rough plumbing
Rough HVAC
Insulation
Drywall
Underlayment
Interior doors installed

Week 4 to 5

Window, door & base trim installed
Painting
Bathroom and kitchen counter tops and cabinets

Week 6

Finish electrical
Finish plumbing
Siding installed

Week 7

Finish HVAC
Hookup to water main, or well drilling
Hookup to sewer or installation of a septic system

Week 8 to 11

Carpet and flooring
Finish painting (Touch up)

Week 12 to 13
Punch list & Move-in
Week 14
Total
14 weeks (approx.)